20+ years of IBM i expertise

IBM i Services

20+ years of expertise to manage, operate and evolve your IBM i systems. A single partner for your entire IBM i lifecycle.

IBM i migration · CDP4i / CDP4i-HA

Secure migration in under an hour

Move an IBM i partition from one Power server to another, with very limited production downtime and the option to roll back or postpone the project at any time — whether the partitions are on-premise or hosted.

  • Under 1 h downtime
  • Zero data loss
  • Reversible at any time
  • On-premise or cloud

Why secure migration

Two risks of classic migration, eliminated

The traditional method exposes you to a long service outage and to data loss. Our CDP4i and CDP4i-HA software removes both risks.

Classic migration: long IBM i production outage.
< 1 hdowntime
Switchover in under an hour thanks to replication.
Classic migration: risk of data loss when reading the backup cartridge or during a roll-back.
0data loss
Secure replication before switchover: no data lost.

The process

Migration in 5 steps

From preparing the target partition to the switchover, each step is validated by the Client.

  1. 1

    Target preparation

    Creation of the target partition and handover of its characteristics to obtain the software keys.

  2. 2

    Restore & tests

    Production backup, restore of apps and data into the target, then Client validation.

  3. 3

    Continuous replication

    CDP4i then CDP4i-HA synchronise and replicate production to the target continuously.

  4. 4

    Switchover

    Production stop, replication finishes within minutes, then network and users switch over.

  5. 5

    Production on target

    Downtime limited to under an hour, with no data loss.

A migration project to a new server or to hosting?

Let's assess your production partition and your IBM i target together.